{ "tool": "steel_beam", "version": "0.1", "project": "Casablanca Hotel - 16 Steel Joists Replacement", "prepared_by": "Conemco Engineering", "section": "W10X15", "values": { "beam_length": 9.0, "unbraced_length": 108.0, "factored_uniform_load": 0.802444, "service_load": 548.98, "moment": 8.124, "shear": 3.611, "E": 29000.0, "Fy": 50.0, "Lp": 2.861083, "Lr": 8.608917, "Lb": 9.0, "rts": 1.01, "Fcr": 32.555772, "Mp": 66.666667, "MnLTB": 37.439137, "Mn": 37.439137, "phiMn": 33.695224, "Aw": 2.5, "lambda": 38.5, "lambda_lim": 53.946344, "kv": 5.34, "Cv1": 1.0, "phi_v": 1.0, "phiVn": 75.0, "delta_limit": 0.45, "delta": 0.040559, "ltb_mode": "elastic LTB", "section_A": 4.41, "section_d": 10.0, "section_b": 4.0, "section_tf": 0.25, "section_tw": 0.25, "section_Ix": 68.9, "section_Zx": 16.0, "section_Sx": 13.8, "section_Iy": 2.89, "section_Zy": 2.3, "section_Sy": 1.45, "section_ry": 0.81, "section_J": 0.104, "section_rts": 1.01, "section_ho": 9.72, "section_lambda": 38.5 }, "checks": { "flexure": { "demand": 8.124, "capacity": 33.695224, "ok": true }, "shear": { "demand": 3.611, "capacity": 75.0, "ok": true }, "deflection": { "demand": 0.040559, "capacity": 0.45, "ok": true } } }